DUO+ 100kW Hot air turbine built and ready for site testing

After a year of development effort, we’ve now finished building the first 100kW DUO+ for Schmid Energy.

The system features a turbocharger supplied by ABB, turbogenerators and power electronics supplied by Bowman Power, cooling system manufactured by Hydac integrated with a control system by Bluebox Energy.

The system will be integrated with the biomass / waste wood furnace and heat exchanger in Switzerland and commissioned at Dudingen in Swizerland during April.

Scroll to Top